Einzelnen Beitrag anzeigen
Alt 14-01-2015, 11:51   #23
Purzelinho
TBB Family
 
Registriert seit: Feb 2010
Beiträge: 1.022
Es läuft!

http://powertripenergy.com/

Zitat:

2014 in Review – 2015 Forecast

by Andy Cochrane | Jan 12, 2015

Group 12-2014 cropped

It was a very good year for solar at Power Trip Energy, across the state, and nationwide. Statewide, about 11.2 MW of pv was installed, which represents in increase in capacity of about 45% over the previous year, which showed an increase of 70% over the year before that. At this point, the Washington cost recovery program payments (that incentivize grid-tied solar pv) totaled about $5 million in 2014.

Locally we installed 68 grid-tied pv projects totalling 484 KW – an increase of 26% in terms of KW over the previous year. In terms of the brands of pv we installed, 60% was SunPower, 35% was SolarWorld, and about 5% was “Made in Washington”.
Purzelinho ist offline   Mit Zitat antworten